48 results
Standard        Number Title Effective Date      
0010.07 How to Mark Up and Submit a Standard for Revision
07/24/2014  
0010.25 Tips for Taking Better Photos
03/22/2017  
0015.10 Cross-Reference for Canceled Construction Standards
02/05/2024  
0015.12 Compatible Unit Names Explained
03/01/2018  
0015.14 Matters to Consider Before Making Material Recommendations
01/23/2018  
0015.40 Treatment of Failed Material
07/17/2023  
0020.13 PPE and Cleaning Materials for Infectious Disease Control
06/23/2020  
0020.19 Water Cooler Cleaning
06/12/2020  
0030.01 Secondary Service Design
06/15/2023  
0035.04 Phase Relations
05/05/2014  
0035.13 Voltage Zones
05/05/2014  
0056.05 Sizing Overhead Working Grounds
04/28/2014  
0056.35 Personal Protective Grounding of Overhead Distribution Lines
04/10/2015  
0056.45 Personal Protective Grounding of Overhead Transmission Lines
02/03/2017  
0057.03 Wheel Chock Application
10/01/2010  
0058.27 Aerial Lift Self-Rescue (Emergency Escape)
04/12/2019  
0058.31 Wood Pole Rescue
09/14/2018  
0093.07 Field Guide to Third-Party Attachments on Poles
10/13/2020  
0093.23 Encountering Non-Compliant Installations of Communications Attachments in the Field
08/17/2020  
0095.04 Working in the Vicinity of Wireless Communications Antennas
05/05/2023  
0100.31 Cold Tie Installation
12/02/2021  
0100.33 Hot Tie Installation
12/02/2021  
0100.35 Neutral Hand Tie Installation
12/02/2021  
0101.75 Excavating Near SCL Poles
07/27/2023  
0114.07 Distribution System Vegetation Management, Overhead, Clearances and Methods
12/16/2021  
0117.23 Wood Pole Condition and Treatment Tag Interpretation
11/07/2018  
0127.23 Open-Type Fused Cutout Operation
07/16/2019  
0175.44 1200 A Inertia Engineering Switch Interrupter Replacement
07/30/2015  
0224.37 Inflatable Duct Sealing Device Selection
01/19/2018  
0261.05 Precast Vault Manufacturer Approval Process
08/27/2021  
0525.04 Properties of Medium Voltage Cables
04/24/2017  
0525.81 Primary Cable Preparation
03/09/2017  
0576.03 Preparation for Bolted and Compression Connections
12/21/2020  
0625.50 Overhead Transformer Lightning Strike Procedure
03/17/2014  
0800.35 Operating Padmount, In-Building, and Subsurface Switchgear
12/21/2016  
1065.11 Cutout and Fuse Selection
02/25/2020  
1065.17 Primary Fuse Selection, Looped Radial System
12/19/2019  
1142.23 Vista Switchgear Condition Assessment
04/06/2017  
1167.13 Padmount Switch Signs and Labels
09/16/2016  
1167.19 Padmount PMH Switchgear Condition Assessment
11/23/2016  
1167.21 Padmount PMH Switchgear Parts Cross Reference
11/29/2023  
1611.05 Excavation in the Vicinity of Underground Transmission Lines
10/02/2020  
1615.03 Hazards and Guidelines When Encountering ACCR (High-Temperature, Low-Sag) Conductor
10/20/2020  
1714.30 Streetlight Handhole Connections
01/30/2015  
2505.14 Accuracy Limits for Substation and Generation Watthour Meters
04/10/2017  
2505.15 Accuracy Tests for Substation and Generation Watthour Metering
07/05/2018  
2526.10 Meter and Instrumentation Maintenance in Substations and Generation Plants
05/23/2017  
2530.05 Programming Parameters for Substation and Generation Watthour Meters
05/24/2018  
48 results