0010.07 |
How to Mark Up and Submit a Standard for Revision
|
07/24/2014 |
|
0010.25 |
Tips for Taking Better Photos
|
03/22/2017 |
|
0015.10 |
Cross-Reference for Canceled Construction Standards
|
02/05/2024 |
|
0015.12 |
Compatible Unit Names Explained
|
03/01/2018 |
|
0015.14 |
Matters to Consider Before Making Material Recommendations
|
01/23/2018 |
|
0015.40 |
Treatment of Failed Material
|
07/17/2023 |
|
0020.13 |
PPE and Cleaning Materials for Infectious Disease Control
|
06/23/2020 |
|
0020.19 |
Water Cooler Cleaning
|
06/12/2020 |
|
0030.01 |
Secondary Service Design
|
06/15/2023 |
|
0035.04 |
Phase Relations
|
05/05/2014 |
|
0035.13 |
Voltage Zones
|
06/05/2014 |
|
0056.05 |
Sizing Overhead Working Grounds
|
04/28/2014 |
|
0056.35 |
Personal Protective Grounding of Overhead Distribution Lines
|
04/10/2015 |
|
0056.45 |
Personal Protective Grounding of Overhead Transmission Lines
|
02/03/2017 |
|
0057.03 |
Wheel Chock Application
|
10/01/2010 |
|
0058.27 |
Aerial Lift Self-Rescue (Emergency Escape)
|
04/12/2019 |
|
0058.31 |
Wood Pole Rescue
|
09/14/2018 |
|
0093.07 |
Field Guide to Third-Party Attachments on Poles
|
10/13/2020 |
|
0093.23 |
Encountering Non-Compliant Installations of Communications Attachments in the Field
|
08/17/2020 |
|
0095.04 |
Working in the Vicinity of Wireless Communications Antennas
|
05/05/2023 |
|
0100.31 |
Cold Tie Installation
|
12/02/2021 |
|
0100.33 |
Hot Tie Installation
|
12/02/2021 |
|
0100.35 |
Neutral Hand Tie Installation
|
12/02/2021 |
|
0101.75 |
Excavating Near SCL Poles
|
07/27/2023 |
|
0114.07 |
Distribution System Vegetation Management, Overhead, Clearances and Methods
|
12/16/2021 |
|
0117.23 |
Wood Pole Condition and Treatment Tag Interpretation
|
11/07/2018 |
|
0127.23 |
Open-Type Fused Cutout Operation
|
07/16/2019 |
|
0175.44 |
1200 A Inertia Engineering Switch Interrupter Replacement
|
07/30/2015 |
|
0224.37 |
Inflatable Duct Sealing Device Selection
|
01/19/2018 |
|
0261.05 |
Precast Vault Manufacturer Approval Process
|
08/27/2021 |
|
0525.04 |
Properties of Medium Voltage Cables
|
04/24/2017 |
|
0525.81 |
Primary Cable Preparation
|
03/09/2017 |
|
0576.03 |
Preparation for Bolted and Compression Connections
|
12/21/2020 |
|
0625.50 |
Overhead Transformer Lightning Strike Procedure
|
03/17/2014 |
|
0800.35 |
Operating Padmount, In-Building, and Subsurface Switchgear
|
12/21/2016 |
|
1065.11 |
Cutout and Fuse Selection
|
02/25/2020 |
|
1065.17 |
Primary Fuse Selection, Looped Radial System
|
12/19/2019 |
|
1142.23 |
Vista Switchgear Condition Assessment
|
04/06/2017 |
|
1167.13 |
Padmount Switch Signs and Labels
|
09/16/2016 |
|
1167.19 |
Padmount PMH Switchgear Condition Assessment
|
11/23/2016 |
|
1167.21 |
Padmount PMH Switchgear Parts Cross Reference
|
11/29/2023 |
|
1611.05 |
Excavation in the Vicinity of Underground Transmission Lines
|
10/02/2020 |
|
1615.03 |
Hazards and Guidelines When Encountering ACCR (High-Temperature, Low-Sag) Conductor
|
10/20/2020 |
|
1714.30 |
Streetlight Handhole Connections
|
01/30/2015 |
|
2505.14 |
Accuracy Limits for Substation and Generation Watthour Meters
|
04/10/2017 |
|
2505.15 |
Accuracy Tests for Substation and Generation Watthour Metering
|
07/05/2018 |
|
2526.10 |
Meter and Instrumentation Maintenance in Substations and Generation Plants
|
05/23/2017 |
|
2530.05 |
Programming Parameters for Substation and Generation Watthour Meters
|
05/24/2018 |
|