0041.05 |
Voltage Flicker Limits
|
12/18/2018 |
|
0072.01 |
Avian Protection
|
06/24/2021 |
|
0081.21 |
Installation of Signs on Transmission Towers
|
12/02/2020 |
|
0093.04 |
Attachments on Wood Poles
|
06/16/2020 |
|
0093.06 |
Communications Bracket Installation
|
07/14/2020 |
|
0093.12 |
Pole Attachment Identification and Tagging
|
07/17/2020 |
|
0094.01 |
Communications Enclosures on Wood Poles
|
06/12/2020 |
|
0095.06 |
Non-Ionizing Electromagnetic Radiation (NIER) Report Requirements
|
12/09/2021 |
|
0095.08 |
Wireless Communications Antenna Tags
|
08/02/2024 |
|
0095.10 |
AMI Collector Antennas
|
06/26/2020 |
|
0095.15 |
Small Wireless Facilities on Wood Poles
|
03/01/2023 |
|
0095.17 |
AMI Repeater Antennas
|
06/29/2020 |
|
0095.20 |
Wireless Communications Antennas on Wood Pole Tops
|
03/16/2023 |
|
0095.23 |
Macrocell Antennas on Transmission Lattice Towers
|
05/05/2023 |
|
0095.30 |
Strand-Mount Antennas, All Except Wi-Fi Hotspot
|
09/15/2020 |
|
0095.35 |
Strand-Mount Antennas, Wi-Fi Hotspot
|
07/29/2020 |
|
0095.60 |
Small Wireless Facilities on Metal Streetlight Poles
|
04/13/2022 |
|
0097.03 |
Installation of Solar Generation Facilities
|
11/18/2024 |
|
0098.51 |
Electric Vehicle (EV) Chargers on Wood Poles
|
02/23/2023 |
|
0098.61 |
Electric Vehicle (EV) Chargers, Curbside Pedestal
|
05/26/2023 |
|
0098.71 |
Electric Vehicle (EV) Chargers on Steel Poles
|
09/15/2022 |
|
0100.02 |
Clearances Between SCL Overhead Distribution Assets and Ground Surfaces
|
11/15/2023 |
|
0100.03 |
Clearances Between SCL Overhead Distribution Assets and Non-SCL Structures, Except Bridges
|
11/15/2023 |
|
0100.04 |
Clearance Between 26 kV Overhead Distribution Conductors and Buildings
|
11/17/2023 |
|
0100.05 |
Clearances Between SCL Overhead Distribution Assets and Bridges
|
11/15/2023 |
|
0100.07 |
Wood Pole Installation
|
06/04/2019 |
|
0100.09 |
Crossarm Braces
|
02/26/2021 |
|
0100.11 |
LR Bracket Installation
|
07/27/2016 |
|
0100.17 |
Neutral Connections, LR Bracket
|
11/18/2020 |
|
0100.21 |
Single-Phase Overhead Jumpers, Unfused
|
05/01/2018 |
|
0100.23 |
Three-Phase Overhead Jumpers, Unfused
|
04/17/2020 |
|
0100.25 |
Overhead Jumpers, Fused Cutout
|
11/10/2020 |
|
0100.41 |
Line Circuit Breakers, Open and Closed, 26 kV
|
11/04/2021 |
|
0101.01 |
Single-Phase Tangent Pole Top Assembly for View Areas
|
03/23/2017 |
|
0101.03 |
Single-Phase Angle Pole Top Assembly for View Areas
|
07/07/2020 |
|
0101.05 |
Single-Phase Deadend Pole Top Assemblies for View Areas
|
07/07/2020 |
|
0103.01 |
Three-Phase Tangent Pole Top Assembly for View Areas
|
03/09/2022 |
|
0103.03 |
Three-Phase Angle Pole Top Assembly for View Areas
|
04/08/2022 |
|
0103.05 |
Three-Phase Deadend Pole Top Assemblies for View Areas
|
04/05/2022 |
|
0104.01 |
Three-Phase Armless Tangent Pole Top Assemblies
|
03/27/2019 |
|
0104.03 |
Three-Phase Armless Angle Pole Top Assemblies
|
05/11/2016 |
|
0104.05 |
Three-Phase Armless Deadend Pole Top Assemblies
|
03/17/2020 |
|
0121.01 |
Single-Phase Tangent Pole Top Assembly
|
06/15/2020 |
|
0121.03 |
Single-Phase Angle Pole Top Assemblies
|
06/15/2020 |
|
0121.05 |
Single-Phase Dead End Pole Top Assemblies
|
06/15/2020 |
|
0123.01 |
Three-Phase Tangent Pole Top Assemblies
|
04/28/2022 |
|
0123.03 |
Three-Phase Angle Pole Top Assemblies
|
05/18/2022 |
|
0123.05 |
Three-Phase Deadend Pole Top Assemblies
|
02/03/2023 |
|
0123.13 |
Three-Phase Tangent and Angle Wing Arm Pole Top Assemblies
|
05/13/2022 |
|
0123.15 |
Three-Phase Deadend Wing Arm Pole Top Assemblies
|
02/08/2023 |
|
0123.21 |
Three-Phase Multi-Gain Tangent Pole Top Assemblies
|
04/18/2022 |
|
0123.23 |
Three-Phase Multi-Gain Angle Pole Top Assemblies
|
04/19/2022 |
|
0123.25 |
Three-Phase Multi-Gain Deadend Pole Top Assemblies
|
05/02/2024 |
|
0125.01 |
Overhead Single-Phase Transformer Installation
|
06/07/2022 |
|
0125.02 |
Overhead Open-Delta Transformer Bank Installation
|
04/08/2024 |
|
0125.03 |
Overhead Three-Phase Transformer Bank Installation
|
09/26/2024 |
|
0125.05 |
Overhead Primary Switch Installation
|
05/13/2024 |
|
0125.07 |
Scada-Mate Primary Switch, 600 A
|
03/08/2018 |
|
0126.01 |
Primary Pole Terminations
|
01/17/2024 |
|
0126.04 |
Riser Extensions
|
11/16/2017 |
|
0126.07 |
Service Splices in Riser Extensions for Direct-Buried Services
|
10/18/2023 |
|
0127.01 |
Terminal Pole with Primary Switch
|
06/09/2022 |
|
0127.03 |
Terminal Pole with Fused Cutouts
|
05/02/2019 |
|
0130.10 |
Overhead Secondary Spans
|
02/14/2020 |
|
0130.20 |
Secondary Service Bridles
|
02/25/2022 |
|
0130.30 |
Secondary Service Drops
|
06/07/2022 |
|
0199.01 |
Guy Assemblies
|
04/28/2020 |
|
0214.00 |
Clearances Between SCL Underground Assets and Non-SCL Structures and Objects
|
10/24/2024 |
|
0221.01 |
Customer Requirements for Trenching in the Right-of-Way
|
04/01/2020 |
|
0222.02 |
Requirements for Primary Conduit and Duct Bank Installation
|
11/15/2023 |
|
0222.04 |
Duct Bank Reinforcement
|
10/11/2021 |
|
0222.06 |
Duct Bank Termination
|
10/06/2021 |
|
0223.03 |
Customer Requirements for Horizontal Directional Drilling (HDD)
|
11/10/2020 |
|
0223.33 |
Cast-in-Place Concrete Vault Collars
|
11/15/2023 |
|
0224.01 |
Customer Requirements for Underground Secondary Service, Looped Radial System
|
11/09/2022 |
|
0224.07 |
Requirements for Secondary Conduit Installation
|
10/31/2022 |
|
0224.34 |
Steel Conduit Risers
|
10/31/2024 |
|
0226.06 |
Installation of Fluidized Thermal Backfill
|
11/20/2020 |
|
0226.11 |
Backfill Operations, General Requirements
|
03/10/2021 |
|
0230.03 |
Requirements for Pad Mounted Termination Enclosure Installations
|
11/15/2023 |
|
0231.01 |
Secondary Handhole Installation and Grounding
|
10/24/2024 |
|
0231.03 |
Cast-in-Place Risers
|
08/04/2017 |
|
0233.05 |
Retrofit Grounding for Secondary Handholes
|
11/09/2018 |
|
0257.06 |
Ceiling Channel for In-Building Vaults
|
11/13/2020 |
|
0257.47 |
Pulling Iron Installation for In-Building Vaults
|
11/09/2022 |
|
0451.01 |
Grounding Electrodes for Distribution Poles
|
11/06/2024 |
|
0461.10 |
Grounding Electrodes for Handholes and Vaults
|
10/28/2022 |
|
0462.10 |
Grounding Electrodes for Overhead Ground Wire (OHGW)
|
08/05/2019 |
|
0468.90 |
Exothermic Connection System
|
09/10/2014 |
|
0473.50 |
Looped Radial and Network Service Entrance Cables in Conduit for Underground Primary Service
|
10/14/2019 |
|
0474.08 |
Looped Radial and Network Dry Vault Service Entrance Bus Duct for Underground Primary Service
|
10/30/2023 |
|
0535.21 |
Heat-Shrink Splices, Straight
|
02/03/2017 |
|
0575.02 |
Bolted Connections
|
12/02/2020 |
|
0575.14 |
Splices, Straight Compression, Non-Tension, Secondary
|
01/05/2021 |
|
0661.03 |
Padmount Transformer, Installation and Grounding, 3F, 75-2500 kVA
|
10/21/2019 |
|
0674.06 |
In-Building Vault Lighting and Receptacle Requirements, Looped Radial System
|
10/30/2023 |
|
0724.50 |
Customer Requirements for Padmount Transformer Services, Looped Radial System
|
11/06/2024 |
|
0732.50 |
Customer Requirements for Below-Grade Transformer Service Vaults, Looped Radial System
|
11/01/2023 |
|
0735.50 |
Oil Containment Systems
|
10/17/2024 |
|
0751.00 |
Customer Requirements, In-Building Transformer Vaults, Network and Looped Radial Systems
|
11/04/2024 |
|
0751.49 |
In-Building Transformer Vault Doors
|
10/22/2021 |
|
0751.60 |
Concurrent Customer Requirements, In-Building Transformer Vaults
|
09/08/2022 |
|
0751.77 |
In-Building Vault Equipment Clearances
|
11/10/2020 |
|
0801.02 |
Switchgear, 27 kV, Padmount, Live-Front
|
11/10/2020 |
|
0801.03 |
Switchgear, 27 kV, Padmount, Dead-Front, PME-Style
|
04/05/2024 |
|
0801.04 |
Switchgear, 27 kV, Padmount, Dead-Front, PSE-Style
|
12/11/2024 |
|
1252.10 |
FIRST HILL VACUUM SWITCH
|
07/28/2010 |
|
1525.00 |
Seattle City Light Technical Metering Unit Guidelines For Transformer Rated Meter Installations
|
07/03/2013 |
|
1553.03 |
Meter Base and Socket Configurations
|
10/16/2019 |
|
1554.33 |
Meter Mounting Configurations, Heights, Working Space, and Clearances, Exterior (Outdoor)
|
10/31/2024 |
|
1554.42 |
Meter Height, Dedicated Equipment Space, Working Space, and Clearances, Equipment Rooms
|
10/31/2022 |
|
1561.05 |
Underground Residential Service Entrances
|
10/05/2022 |
|
1561.07 |
Customer Requirements for Underground Secondary Service Termination Facilities
|
10/18/2023 |
|
1561.09 |
Customer Requirements for Underground Secondary Service Termination Handholes in the Public Right-of-Way
|
12/19/2016 |
|
1562.05 |
PRIMARY METERING COMPARTMENT REQUIREMENTS, 27 kV
|
03/22/2011 |
|
1562.55 |
PRIMARY METERING COMPARTMENT REQUIREMENTS, 5 KV AND 15 KV
|
03/22/2011 |
|
1621.10 |
115 kV Tangent Pole Top Assemblies
|
03/06/2017 |
|
1621.20 |
115 kV Angle Pole Top Assemblies
|
08/15/2017 |
|
1621.30 |
115 kV Vertical Deadend Pole Top Assemblies
|
11/13/2017 |
|
1712.00 |
Streetlight Luminaire Installation on Wood Poles
|
08/02/2024 |
|
1713.12 |
Floodlight Installation, Single and Cluster-Mount on Wood Poles
|
11/12/2024 |
|
1714.10 |
STREETLIGHT CIRCUIT TAGGING AND IDENTIFICATION SYSTEM
|
08/06/2013 |
|
1714.50 |
Underground Streetlight Systems
|
10/20/2023 |
|
1716.07 |
Streetlight Handhole and Conduit Requirements
|
08/21/2019 |
|
1716.12 |
Streetlight, Precast, Concrete Foundation Installation
|
10/27/2015 |
|
1716.34 |
Requirements for Streetlight Pole Mounting and Grouting
|
10/27/2015 |
|
1716.38 |
Streetlight Poles, Chief Seattle, Foundation, Base, and Collar Installation
|
01/15/2019 |
|
1730.00 |
Streetlight Fusing Schedule, Individual
|
06/21/2024 |
|
1760.60 |
Temporary Service for Streetlights on Metal Poles
|
01/10/2020 |
|
1810.05 |
SHARED STREETLIGHT AND TRAFFIC CONTROL HANDHOLES
|
03/21/2016 |
|
D10-11 |
COPPER WIRE SIZES FOR DISTRIBUTION TRANSFORMERS SECONDARY CONNECTIONS
|
10/23/2002 |
|
D10-3.3 |
Fused Cutout Mounting – Contaminated Atmosphere
|
06/07/2016 |
|
D11-12 |
26 kV Automatic Line Sectionalizer Single-Phase Electronic Type Units On Tangent Construction
|
06/07/2016 |
|
D11-13 |
26 kV Automatic Line Sectionalizer
|
06/07/2016 |
|
D11-2 |
27 kV Fault Limiter Installation
|
06/23/2004 |
|
D14-1 |
AMPACT TAP CHART
|
12/28/2004 |
|
D14-6 |
DISTRIBUTION LINE CONNECTIONS
|
07/15/2003 |
|
D14-8/NSV-10 |
TOOL AND DIE CROSS-REFERENCE FOR CONNECTORS
|
01/15/2003 |
|
D15-2.5 |
INSTALLING DOUBLE TIE ON DOUBLE ARM (TWO INSULATORS) FOR COPPER OR ALUMINUM CONDUCTORS
|
02/05/2001 |
|
D8-10 |
TYPICAL NUMBER BOARD INSTALLATION
|
02/05/2004 |
|
D8-11 |
D8-11 26 KV - 3 POLE GANG OPERATED AIR BREAK SWITCH, WOOD CROSSARM retained for maintenance and reference only D811
|
07/03/2009 |
|
D8-12 |
26 kV, 3-Pole Gang Operated Air Break Switch, Unitized
|
07/03/2009 |
|
D8-14 |
TYPICAL 26 KV SWITCH TERMINATION ASSEMBLY
|
06/04/2001 |
|
D8-20 |
26/34.5 kV Vertical Switch, 1200 A, 3 Pole, Gang Operated, for Wood Pole Mounting, 1200 A Cable Termination Industry Standards
|
10/19/2015 |
|
D9-11.6 |
4/0 PARALLEL CABLE
|
12/18/1998 |
|
D9-20 |
DOUBLE CIRCUIT 4 KV SWITCH INSTALLATION
|
03/17/2000 |
|
D9-21 |
4 KV SWITCH INSTALLATION
|
03/17/2000 |
|
DU11-4 |
Cable Limiters, Distribution
|
11/03/2014 |
|
DU2-0/NGE-10 |
RECOMMENDED TYPICAL STREET MARKING
|
01/11/2002 |
|
DU5-5 |
Pole Termination, 600 Volt Underground to Overhead 1. Notes
|
10/27/2014 |
|
NCB-10 |
GROUNDING NETWORK SYSTEM DRY TRANSFORMER VAULTS, ALUMINUM BUS
|
09/16/2010 |
|
NCB-120 |
2000 AMP 600 VOLT ONE WAY AND TWO WAY SUBMERSIBLE CONNECTORS FOR ALUMINUM TO ALUMINUM AND ALUMINUM TO COPPER SECONDARY CABLES NETWORK AREA
|
09/04/2001 |
|
NCB-130 |
Network Protector Indicator Lights
|
04/07/2016 |
|
NCB-140 |
Fire Detection Installation Details and Wiring Diagram for Dry Vaults
|
08/14/2023 |
|
NCB-141 |
Fire Detection Installation Details and Wiring Diagram for Wet Vaults
|
08/14/2023 |
|
NCB-150 |
Installation of Alley Wall Risers and Cans
|
08/19/2008 |
|
NCB-170 |
GROUNDING of PADMOUNT SPECIALTY & AUTOTRANSFORMERS
|
07/10/2001 |
|
NCB-180 |
Fire Detection System Retrofit Network Protector for Waterproofing
|
09/28/2000 |
|
NCB-20 |
GROUNDING NETWORK SYSTEM TRANSFORMER VAULTS WET, DRY, OR SPOT - COPPER BUS
|
04/10/2006 |
|
NCB-30 |
GROUNDING NETWORK SYSTEM, WET VAULT, NON-TRANSFORMER ONE OR TWO 48-INCH BUS BARS
|
02/01/2011 |
|
NCB-40 |
NETWORK SPOT OR SYSTEM MULTI-TRANSFORMER WET OR DRY VAULT INSULATED GROUND/NEUTRAL BUS INSTALLATION
|
11/18/2011 |
|
NCB-60 |
IWCB INSTALLATION AND MOUNTING PARTS
|
10/16/2010 |
|
NCB-70 |
TRAFFIC AND STREETLIGHT SERVICES IN NETWORK AREAS
|
04/19/2017 |
|
NCI-100 |
CABLE SUPPORT BRACKET WALL MOUNTED
|
10/17/2014 |
|
NCI-110 |
CABLE HANGERS - FOR NETWORK VAULTS MULTIPLE CONDUCTOR HANGER
|
03/17/1997 |
|
NCI-140 |
ARMORED CABLE SUPPORT FOR HIGH RISE BUILDINGS
|
12/31/2000 |
|
NCI-160 |
UNDERGROUND SECONDARY CABLE - TRAINING & RACKING
|
02/08/1999 |
|
NCI-180 |
CABLE END SEALING
|
04/20/2007 |
|
NCI-210 |
Cable Accessories for 1000 KCMIL, EPR, 15 kV Flat Strap Triplexed Network Cable 623670
|
12/26/2013 |
|
NCI-80 |
CABLE, EQUIPMENT AND FACILITY IDENTIFICATION
|
09/14/2007 |
|
NCI-91 |
SEALING CONDUITS
|
09/17/2013 |
|
NCI-99 |
LIGHT DUTY INSULATED SUPPORT ASSEMBLY NETWORK FACILITIES
|
10/02/2001 |
|
NDK-140 |
SQUARE TILE DUCT REBUILD
|
04/21/1999 |
|
NDK-150 |
Insulation Detail for City Light Duct Banks That Cross Steam Lines
|
02/10/2014 |
|
NSP-100 |
Three-Conductor, 13.8 kV, Straight Splice, Polyethylene Insulation
|
06/13/2001 |
|
NSP-110 |
TRIFURCATION of THREE CONDUCTOR POLYETHYLENE CABLE, 13 & 28 KV WITH and WITHOUT NEUTRAL/GROUND WIRES
|
12/18/2008 |
|
NSP-115 |
THREE CONDUCTOR, 13.8KV PRIMARY SPLICE BELTS COMPACT SECTOR CABLES ONLY
|
07/10/2001 |
|
NSP-120 |
13.8 KV PRIMARY WYE SPLICE POLYETHYLENE INSULATION
|
09/29/1999 |
|
NSP-130 |
26-KV PRIMARY WYE SPLICE - POLYETHYLENE INSULATION
|
07/10/2001 |
|
NSP-140 |
13.8 KV END BELL, PAPER INSULATED, LEAD COVERED
|
05/23/2001 |
|
NSP-171 |
FLAT STRAP SHIELDING TERMINATION FOR USE IN DELTA NETWORK ONLY
|
05/01/2002 |
|
NSP-20 |
SPLICE - STRAIGHT TWO CONDUCTOR CONCENTRIC, 5000 VOLT POLYETHYLENE INSULATED COPPER CABLE
|
08/10/2001 |
|
NSP-200 |
SPLICE, WYE, THREE CONDUCTOR, 26 kV PAPER INSULATED, LEAD SHEATH
|
08/24/2001 |
|
NSP-210 |
SPLICE- STRAIGHT, THREE CONDUCTOR, 26 kV PAPER INSULATED, LEAD SHEATH
|
06/19/2001 |
|
NSP-220 |
TERMINATION POTHEAD, 25 KV SINGLE CONDUCTOR, PILC-PEJ
|
10/27/2004 |
|
NSP-250 |
TERMINATOR - 13 KV FOR INVERTED INSTALLATION
|
06/10/2001 |
|
NSP-270 |
TERMINATION OF 3/C XLP INSULATED, JACKETED CABLE USING PATR TERMINATORS, 15 kV OR 26 kV ROUND CONDUCTORS
|
07/20/2005 |
|
NSP-280 |
TERMINATION OF 3/C 15 KV XLP INSULATED, PVC JACKETED CABLE USING 600 A DEAD BREAK ELBOWS ON AIR INSULATED METALCLAD SWITCHGEAR
|
02/17/1999 |
|
NSP-30 |
SPLICE - STRAIGHT - 5000 VOLT, TWO CONDUCTOR CONCENTRIC, POLYETHYLENE INSULATED TO SINGLE CONDUCTOR
|
08/10/2001 |
|
NSP-320 |
DEADBREAK STRAIGHT LINE CONNECTOR 600 AMP, 13 KV and 26 KV
|
07/07/2014 |
|
NSP-321 |
25kV 600 AMP, Straight Receptacle Installation lnstructions
|
05/15/2003 |
|
NSP-350 |
GROUND CONNECTION FOR SPLICES IN NETWORK VAULTS AND MANHOLES
|
02/24/1999 |
|
NSP-60 |
TERMINATION, 2/C, 5 KV, CONCENTRIC POLYETHYLENE INSULATION
|
08/10/2001 |
|
NSP-80 |
SPLICE, WYE, THREE CONDUCTOR, 13 KV PAPER INSULATED, LEAD SHEATH
|
10/27/2004 |
|
NSP-90 |
SPLICE- STRAIGHT, THREE CONDUCTOR, 13 kV PAPER INSULATED, LEAD SHEATH
|
06/19/2001 |
|
NTP-120 |
HAZELTINE MODEL 2391 TRANSMITTER INSTALLATION TYPE O1
|
07/28/2005 |
|
NTP-121 |
HAZELTINE MODEL 2800 TRANSMITTER INSTALLATION TYPE O2
|
07/28/2005 |
|
NTP-122 |
HAZELTINE MODEL 2778 TRANSMITTER INSTALLATION TYPE O3
|
08/29/2007 |
|
NTP-123 |
DIGITALGRID NCS TRANSMITTER INSTALLATION, NETWORK PROTECTORS
|
10/03/2007 |
|
NTP-130 |
BUS TIE SWITCH INSTALLATION
|
09/10/2008 |
|
NTP-41 |
SEISMIC ANCHORING FOR OIL FILLED SPECIALTY TRANSFORMERS
|
01/25/2000 |
|
NTP-60 |
Lighting and Sump Pump Installation for Single Transformer Vaults
|
11/13/2013 |
|
NTP-70 |
HIGH VOLTAGE SWITCHROOM & MULTI-TRANSFORMER NETWORK VAULT LIGHT and RECEPTACLE CIRCUITS
|
09/28/2000 |
|
NTP-80 |
Network Protector Fusing, Lead Sizes and Relays
|
07/28/2017 |
|
NTP-90 |
Cable Limiters - Network
|
11/03/2014 |
|
NVH-80 |
Network Area Requirements for Panel or Cast-in-Place Vaults
|
11/14/2023 |
|
S128-1 |
WELDING AND CUTTING PRACTICES
|
05/01/2002 |
|
S319-0/NSA-10 |
HAND SIGNALS FOR USE IN LINE CONSTRUCTION
|
04/28/2002 |
|
S319-1/NSA-20 |
HAND SIGNALS FOR SHOVEL AND CRANE OPERATION
|
05/01/2002 |
|
S319-2/NSA-30 |
SAFE WORKING LOAD FOR ROPES AND SLINGS
|
05/01/2002 |
|
S403-1 |
SAFE POLE CLIMBING PRACTICES
|
05/01/2002 |
|
U10-1.2 |
Transformer Pad, Commercial and Industrial Underground from Overhead
|
12/30/2015 |
|
U10-1.4 |
PADMOUNT TRANSFORMER INSTALLATION, GROUNDING AND CONNECTIONS 240/120 V, 1Ø, 3W, 25 THROUGH 167 kVA
|
12/03/2010 |
|
U10-5.2 |
Pad Construction for Pad-Mounted Switchgear
|
08/15/2023 |
|
U10-5.3/NTP-40 |
NETWORK TRANSFORMER ANCHOR BEAM FOR SEISMIC LOADING (EARTHQUAKE ANCHORS)
|
11/08/2013 |
|
U10-5.5/NTP-50 |
VIBRATION DAMPERS NETWORK TYPE AND SINGLE PHASE TRANSFORMERS
|
03/21/2000 |
|
U11-8 |
Commercial Subway Transformer 750 through 2500 kVA, Standard Installation
|
08/15/2017 |
|
U11-9 NTP-110 |
TRANSFORMER AND NETWORK PROTECTOR SECONDARY BOLTING AND TAPING
|
10/26/2016 |
|
U13-1/NGE-50 |
ELECTRICAL INSULATING OIL SAMPLING AND TESTING FLAT GAP
|
04/01/2005 |
|
U1-4.12/NCI-61 |
Pulling Cable Around Blocks
|
07/08/1996 |
|
U1-4.15/NCI-20 |
Guide for High DC Voltage Field Testing of Insulated Power Cable
|
10/05/2011 |
|
U1-4.51/NTP-100 |
Transformer Secondary Lead Sizes for Underground Installations
|
08/01/2007 |
|
U2-11.40/NDK-40 |
Mandreling and Cleaning of Ducts and Conduits
|
11/14/2023 |
|
U2-12.1/NVH-60 |
SUMP PUMP PIPE INSTALLATION, VAULTS and MANHOLES NEW 2” or REPAIR 1-1/4
|
06/04/2001 |
|
U2-14.2 |
Vault Installation
|
11/14/2023 |
|
U2-15.1 |
Installation of Ring Type Vaults
|
11/14/2023 |
|
U2-16 |
VAULT, MANHOLE, HANDHOLE NUMBER IDENTIFICATION
|
09/04/2001 |
|
U2-22 |
Precast Panel Vault Installation, General, Non-Network Area
|
11/10/2020 |
|
U2-6/NVH-20 |
INSPECTION AND REPAIR PROCEDURES FOR PRECAST VAULTS AND MANHOLES
|
02/01/2008 |
|
U4-2.8/NCI-150 |
BENDING, TRAINING, AND RACKING UNDERGROUND SECONDARY CABLE (SERVICES AND/OR BUS TIES)
|
02/12/1999 |
|
U4-3 NCI-170 |
BENDING, TRAINING, RACKING AND RE-REELING OF UNDERGROUND PRIMARY CABLE
|
03/07/2017 |
|
U4-3.3 |
CABLE TAGGING AND PHASE MARKINGS
|
09/14/2007 |
|
U4-3.5/NCI-130 |
CREEPAGE OF CABLE
|
07/06/1999 |
|
U4-3.6/NCI-70 |
DUCT EDGE PROTECTION
|
03/22/2002 |
|
U4-3.7/NCI-90 |
FIRE AND ELECTRIC ARC PROOFING OF CABLES
|
03/02/2006 |
|
U4-5/NCB-50 |
INSTALLATION OF SECONDARY BUS BAR
|
12/06/2013 |
|
U5-1.03/NCB-100 |
Application Data For Heat-Shrinkable Splice Covers And Cable Caps
|
11/03/2014 |
|
U5-1.10/NCB-110 |
SUBMERSIBLE MULTIPLE CONNECTOR INSTALLATION FOR ALUMINUM OR COPPER SECONDARY CABLE-TYPE USE
|
11/18/2013 |
|
U5-14/NSP-310 |
600 AMPERE PRIMARY EQUIPMENT TERMINATION
|
10/17/2014 |
|
U5-15.05 |
SEPARABLE CONNECTOR (ELBOW), 200 A, LOADBREAK
|
01/25/2008 |
|
U5-16.05 |
SEPARABLE CONNECTOR (ELBOW), 200 A, DEADBREAK
|
01/25/2008 |
|
U5-17.05/NSP-304 |
Separable Connector (T-Body), 125 kV BIL, Deadbreak
|
12/23/2014 |
|
U5-17.10/NSP-305 |
SEPARABLE CONNECTOR (T-BODY), 150 kV BIL, DEADBREAK
|
01/25/2008 |
|
U5-2.7 |
J BOX MOUNTING AND GROUNDING
|
07/10/2001 |
|
U5-2.8.4/NSP-300 |
600 AMP PRIMARY CONNECTORS AND CABLE MOUNTING METHODS
|
10/14/2016 |
|
U5-2.8.5 |
TERMINATOR ELBOW RECEPTACLE INSTALLATION #8 KERITE CABLE
|
02/12/1999 |
|
U5-2.8.7 |
200 AMPERE ELBOW SEALING ON 1/0, 28 KV JACKETED CONCENTRIC NEUTRAL CABLE
|
10/06/2006 |
|
U5-2.9 |
2000 AMP, 600 VOLT ONE WAY AND TWO WAY SUBMERSIBLE CONNECTORS FOR ALUM. TO ALUM. AND ALUM. TO COPPER SECONDARY CABLES
|
09/04/2001 |
|
U5-26.20/NSP-285 |
TERMINATION, 200 kV BIL, COLD SHRINK
|
12/11/2008 |
|
U5-3.20.1/NSP-170 |
SPLICE, STRAIGHT, 28 KV, XLP OR EPR INSULATED CABLE
|
06/19/2001 |
|
U5-3.20.3 |
GROUNDING SPLICES ON 28 kV DRAIN WIRE-SHIELDED CABLE
|
12/22/2005 |
|
U5-3.20.4 |
GROUNDING 3M COLD SHRINK SPLICES ON 28 kV FLAT STRAP CABLE
|
05/23/2005 |
|
U5-3.22.1 |
JACKET SEALING WHEN SPLICING JACKETED 1/0 28 kV C.N. CABLE TO BARE 1/0 28 kV C.N. CABLE
|
05/15/2008 |
|
U5-7 |
INTERCEPTING EXISTING UNDERGROUND SERVICE
|
11/02/2001 |
|
U7-2/NDK-130 |
RIGID ALUMINUM CONDUIT
|
01/16/2002 |
|
U9-5 |
577 VAULT TRANSFORMER AND JUNCTION BOX INSTALLATION, GROUNDING AND CONNECTIONS
|
07/20/2010 |
|
U9-5.5 |
Three-Phase Loadbreak Vault, 612 and Larger
|
03/01/2015 |
|
U9-6 |
577 VAULT WITH THREE LOADBREAK JUNCT ION BOX ES, INSTALLATION, GROUNDING AND CONNECTIONS
|
10/30/2015 |
|
U9-7.3 |
Grounding and Connection Diagram, Single Phase 26 kV Distribution Transformer
|
04/30/2014 |
|
U9-7.5 |
Transformer Installation, Grounding and Connections 120/240 V and 240/480 V, 3-Phase, 4-Wire
|
04/30/2014 |
|
U9-7.7 |
Transformer Installation, Grounding and Connections 208Y/120, 240Y/138, and 480Y/277 V, 3-Phase, 4-Wire Subtractive Polarity
|
08/15/2017 |
|