259 results
Standard

Number

Title Effective Date      
0041.05 Voltage Flicker Limits 12/18/2018  
0072.01 Avian Protection 06/24/2021  
0081.21 Installation of Signs on Transmission Towers 12/02/2020  
0093.04 Attachments on Wood Poles 06/16/2020  
0093.06 Communications Bracket Installation 07/14/2020  
0093.12 Pole Attachment Identification and Tagging 07/17/2020  
0094.01 Communications Enclosures on Wood Poles 06/12/2020  
0095.06 Non-Ionizing Electromagnetic Radiation (NIER) Report Requirements 12/09/2021  
0095.08 Wireless Communications Antenna Tags 07/22/2020  
0095.10 AMI Collector Antennas 06/26/2020  
0095.15 Small Wireless Facilities on Wood Poles 09/18/2020  
0095.17 AMI Repeater Antennas 06/29/2020  
0095.20 Macrocell Antennas on Wood Poles 01/07/2022  
0095.30 Strand-Mount Antennas, All Except Wi-Fi Hotspot 09/15/2020  
0095.35 Strand-Mount Antennas, Wi-Fi Hotspot 07/29/2020  
0095.60 Small Wireless Facilities on Metal Streetlight Poles 04/13/2022  
0098.51 Electric Vehicle (EV) Chargers on Wood Poles 10/11/2021  
0098.61 Electric Vehicle (EV) Chargers, Curbside Pedestal 03/31/2022  
0100.07 Wood Pole Installation 06/04/2019  
0100.09 Crossarm Braces 02/26/2021  
0100.11 LR Bracket Installation 07/27/2016  
0100.17 Neutral Connections, LR Bracket 11/18/2020  
0100.21 Single-Phase Overhead Jumpers, Unfused 05/01/2018  
0100.23 Three-Phase Overhead Jumpers, Unfused 04/17/2020  
0100.25 Overhead Jumpers, Fused Cutout 11/10/2020  
0100.41 Line Circuit Breakers, Open and Closed, 26 kV 11/04/2021  
0101.01 Single-Phase Tangent Pole Top Assembly for View Areas 03/23/2017  
0101.03 Single-Phase Angle Pole Top Assembly for View Areas 07/07/2020  
0101.05 Single-Phase Deadend Pole Top Assemblies for View Areas 07/07/2020  
0103.01 Three-Phase Tangent Pole Top Assembly for View Areas 03/09/2022  
0103.03 Three-Phase Angle Pole Top Assembly for View Areas 04/08/2022  
0103.05 Three-Phase Deadend Pole Top Assemblies for View Areas 04/05/2022  
0104.01 Three-Phase Armless Tangent Pole Top Assemblies 03/27/2019  
0104.03 Three-Phase Armless Angle Pole Top Assemblies 05/11/2016  
0104.05 Three-Phase Armless Deadend Pole Top Assemblies 03/17/2020  
0121.01 Single-Phase Tangent Pole Top Assembly 06/15/2020  
0121.03 Single-Phase Angle Pole Top Assemblies 06/15/2020  
0121.05 Single-Phase Dead End Pole Top Assemblies 06/15/2020  
0123.01 Three-Phase Tangent Pole Top Assemblies 04/28/2022  
0123.03 Three-Phase Angle Pole Top Assemblies 05/18/2022  
0123.05 Three-Phase Deadend Pole Top Assemblies 04/22/2022  
0123.13 Three-Phase Tangent and Angle Wing Arm Pole Top Assemblies 05/13/2022  
0123.15 Three-Phase Deadend Wing Arm Pole Top Assemblies 04/19/2022  
0123.21 Three-Phase Multi-Gain Tangent Pole Top Assemblies 04/18/2022  
0123.23 Three-Phase Multi-Gain Angle Pole Top Assemblies 04/19/2022  
0123.25 Three-Phase Multi-Gain Deadend Pole Top Assemblies 04/27/2022  
0125.01 Overhead Single-Phase Transformer Installation 01/05/2022  
0125.02 Overhead Open-Delta Transformer Bank Installation 01/05/2022  
0125.03 Overhead Three-Phase Transformer Bank Installation 01/05/2022  
0125.05 Overhead Primary Switch Installation 01/26/2022  
0125.07 Scada-Mate Primary Switch, 600 A 03/08/2018  
0126.01 Primary Pole Terminations 03/11/2021  
0126.04 Riser Extensions 11/16/2017  
0127.01 Terminal Pole with Primary Switch 03/09/2022  
0127.03 Terminal Pole with Fused Cutouts 05/02/2019  
0130.10 Overhead Secondary Spans 02/14/2020  
0130.20 Secondary Service Bridles 02/25/2022  
0130.30 Secondary Service Drops 11/05/2019  
0199.01 Guy Assemblies 04/28/2020  
0214.00 Clearances Between SCL Underground Structures and Other Structures 10/22/2021  
0221.01 Customer Requirements for Trenching in the Right-of-Way 04/01/2020  
0222.02 Requirements for Primary Conduit and Duct Bank Installation 10/22/2021  
0222.04 Duct Bank Reinforcement 10/11/2021  
0222.06 Duct Bank Termination 10/06/2021  
0223.03 Customer Requirements for Horizontal Directional Drilling (HDD) 11/10/2020  
0223.33 Cast-in-Place Concrete Vault Collars 11/17/2021  
0224.01 Customer Requirements for Underground Secondary Service, Looped Radial System 11/06/2020  
0224.07 Requirements for Secondary Conduit Installation 10/22/2021  
0224.34 Steel Conduit Risers 10/22/2021  
0226.06 Installation of Fluidized Thermal Backfill 11/20/2020  
0226.11 Backfill Operations, General Requirements 03/10/2021  
0230.03 Requirements for Pad Mounted Termination Enclosure Installations 12/09/2020  
0231.01 Secondary Handhole Installation and Grounding 10/22/2021  
0231.03 Cast-in-Place Risers 08/04/2017  
0233.05 Retrofit Grounding for Secondary Handholes 11/09/2018  
0257.06 Ceiling Channel for In-Building Vaults 11/13/2020  
0451.01 Grounding Electrodes for Distribution Poles 08/24/2015  
0461.10 Grounding Electrodes for Handholes and Vaults 10/22/2021  
0462.10 Grounding Electrodes for Overhead Ground Wire (OHGW) 08/05/2019  
0468.90 Exothermic Connection System 09/10/2014  
0473.50 Looped Radial and Network Service Entrance Cables in Conduit for Underground Primary Service 10/14/2019  
0474.08 Looped Radial and Network Dry Vault Service Entrance Bus Duct for Underground Primary Service 11/09/2017  
0535.21 Heat-Shrink Splices, Straight 02/03/2017  
0575.02 Bolted Connections 12/02/2020  
0575.14 Splices, Straight Compression, Non-Tension, Secondary 01/05/2021  
0661.03 Padmount Transformer, Installation and Grounding, 3F, 75-2500 kVA 10/21/2019  
0674.06 In-Building Vault Lighting and Receptacle Requirements, Looped Radial System 10/16/2019  
0724.50 Customer Requirements for Padmount Transformer Services, Looped Radial System 10/22/2021  
0732.50 Customer Requirements for Below-Grade Transformer Service Vaults, Looped Radial System 10/28/2021  
0735.50 Oil Containment Systems 11/13/2020  
0751.00 Customer Requirements, In-Building Transformer Vaults, Network and Looped Radial Systems 10/22/2021  
0751.49 In-Building Transformer Vault Doors 10/22/2021  
0751.60 Concurrent Customer Requirements, In-Building Transformer Vaults 10/22/2021  
0751.77 In-Building Vault Equipment Clearances 11/10/2020  
0801.02 Switchgear, 27 kV, Padmount, Live-Front 11/10/2020  
1252.10 FIRST HILL VACUUM SWITCH 07/28/2010  
1525.00 Seattle City Light Technical Metering Unit Guidelines For Transformer Rated Meter Installations 07/03/2013  
1553.03 Meter Base and Socket Configurations 10/16/2019  
1561.05 Customer Requirements for Underground Residential Service Entrances, Single and Dual Meters 11/01/2021  
1561.07 Customer Requirements for Underground Secondary Service Termination Facilities 11/10/2020  
1561.09 Customer Requirements for Underground Secondary Service Termination Handholes in the Public Right-of-Way 12/19/2016  
1562.05 PRIMARY METERING COMPARTMENT REQUIREMENTS, 27 kV 03/22/2011  
1562.55 PRIMARY METERING COMPARTMENT REQUIREMENTS, 5 KV AND 15 KV 03/22/2011  
1621.10 115 kV Tangent Pole Top Assemblies 08/15/2017  
1621.20 115 kV Angle Pole Top Assemblies 08/15/2017  
1621.30 115 kV Vertical Deadend Pole Top Assemblies 11/13/2017  
1712.00 Streetlight Luminaire Installation on Wood Poles 09/13/2018  
1713.12 Floodlight Installation, Single and Cluster-Mount on Wood Poles 03/31/2022  
1714.10 STREETLIGHT CIRCUIT TAGGING AND IDENTIFICATION SYSTEM 08/06/2013  
1714.50 Underground Streetlight Systems 08/22/2019  
1716.07 Streetlight Handhole and Conduit Requirements 08/21/2019  
1716.12 Streetlight, Precast, Concrete Foundation Installation 10/27/2015  
1716.34 Requirements for Streetlight Pole Mounting and Grouting 10/27/2015  
1716.38 Streetlight Poles, Chief Seattle, Foundation, Base, and Collar Installation 01/15/2019  
1730.00 Streetlight Fusing Schedule, Individual 04/25/2019  
1760.60 Temporary Service for Streetlights on Metal Poles 01/10/2020  
1810.05 SHARED STREETLIGHT AND TRAFFIC CONTROL HANDHOLES 03/21/2016  
D10-11 COPPER WIRE SIZES FOR DISTRIBUTION TRANSFORMERS SECONDARY CONNECTIONS 10/23/2002  
D10-3.3 Fused Cutout Mounting – Contaminated Atmosphere 06/07/2016  
D11-12 26 kV Automatic Line Sectionalizer Single-Phase Electronic Type Units On Tangent Construction 06/07/2016  
D11-13 26 kV Automatic Line Sectionalizer 06/07/2016  
D11-2 27 kV Fault Limiter Installation 06/23/2004  
D12-1 STREETLIGHT WIRING DIAGRAMS NOT FOR NEW CONSTRUCTION 12/06/2002  
D14-1 AMPACT TAP CHART 12/28/2004  
D14-3 Bare Conductors Mechanical and Electrical Properties 09/30/2003  
D14-6 DISTRIBUTION LINE CONNECTIONS 07/15/2003  
D14-8/NSV-10 TOOL AND DIE CROSS-REFERENCE FOR CONNECTORS 01/15/2003  
D15-2.1 HAND WRAPPED TIES SINGLE PIN TYPE INSULATOR FOR COPPER OR ALUMINUM POLY COVERED CONDUCTORS 02/05/2001  
D15-2.2 HAND WRAPPED SPOOL TIES FOR COPPER OR ALUMINUM POLY COVERED CONDUCTORS SINGLE TIE 02/05/2001  
D15-2.3 INSTALLING SINGLE HOT TIE ON SINGLE INSULATOR FOR COPPER OR ALUMINUM CONDUCTORS 02/05/2001  
D15-2.4 INSTALLING DOUBLE HOT TIE ON SINGLE INSULATOR FOR COPPER OR ALUMINUM CONDUCTORS 02/05/2001  
D15-2.5 INSTALLING DOUBLE TIE ON DOUBLE ARM (TWO INSULATORS) FOR COPPER OR ALUMINUM CONDUCTORS 02/05/2001  
D15-2.6 ANGLE TIE ON SINGLE INSULATOR AND SINGLE SIDE TIE ON HORIZONTAL INSULATOR FOR COPPER OR ALUMINUM CONDUCTOR FOR COPPER OR ALUMINUM CONDUCTORS 02/05/2001  
D2-3 Clearances from Structures and Ground 01/30/2018  
D8-10 TYPICAL NUMBER BOARD INSTALLATION 02/05/2004  
D8-11 D8-11 26 KV - 3 POLE GANG OPERATED AIR BREAK SWITCH, WOOD CROSSARM retained for maintenance and reference only D811 07/03/2009  
D8-12 26 kV, 3-Pole Gang Operated Air Break Switch, Unitized 07/03/2009  
D8-14 TYPICAL 26 KV SWITCH TERMINATION ASSEMBLY 06/04/2001  
D8-20 26/34.5 kV Vertical Switch, 1200 A, 3 Pole, Gang Operated, for Wood Pole Mounting, 1200 A Cable Termination Industry Standards 10/19/2015  
D9-11.6 4/0 PARALLEL CABLE 12/18/1998  
D9-20 DOUBLE CIRCUIT 4 KV SWITCH INSTALLATION 03/17/2000  
D9-21 4 KV SWITCH INSTALLATION 03/17/2000  
DU11-4 Cable Limiters, Distribution 11/03/2014  
DU2-0/NGE-10 RECOMMENDED TYPICAL STREET MARKING 01/11/2002  
DU5-18 POLE TERMINATION, 26 KV SINGLE PHASE UNDERGROUND SUPPLY TO OVERHEAD TRANSFORMER 02/24/1999  
DU5-5 Pole Termination, 600 Volt Underground to Overhead 1. Notes 10/27/2014  
NCB-10 GROUNDING NETWORK SYSTEM DRY TRANSFORMER VAULTS, ALUMINUM BUS 09/16/2010  
NCB-120 2000 AMP 600 VOLT ONE WAY AND TWO WAY SUBMERSIBLE CONNECTORS FOR ALUMINUM TO ALUMINUM AND ALUMINUM TO COPPER SECONDARY CABLES NETWORK AREA 09/04/2001  
NCB-130 Network Protector Indicator Lights 04/07/2016  
NCB-140 Fire Detection Installation Details and Wiring Diagram for Dry Vault 10/28/2015  
NCB-141 Fire Detection Installation Details and Wiring Diagram for Wet Vaults 04/07/2016  
NCB-150 Installation of Alley Wall Risers and Cans 08/19/2008  
NCB-170 GROUNDING of PADMOUNT SPECIALTY & AUTOTRANSFORMERS 07/10/2001  
NCB-180 Fire Detection System Retrofit Network Protector for Waterproofing 09/28/2000  
NCB-20 GROUNDING NETWORK SYSTEM TRANSFORMER VAULTS WET, DRY, OR SPOT - COPPER BUS 04/10/2006  
NCB-30 GROUNDING NETWORK SYSTEM, WET VAULT, NON-TRANSFORMER ONE OR TWO 48-INCH BUS BARS 02/01/2011  
NCB-40 NETWORK SPOT OR SYSTEM MULTI-TRANSFORMER WET OR DRY VAULT INSULATED GROUND/NEUTRAL BUS INSTALLATION 11/18/2011  
NCB-60 IWCB INSTALLATION AND MOUNTING PARTS 10/16/2010  
NCB-70 TRAFFIC AND STREETLIGHT SERVICES IN NETWORK AREAS 04/19/2017  
NCI-100 CABLE SUPPORT BRACKET WALL MOUNTED 10/17/2014  
NCI-110 CABLE HANGERS - FOR NETWORK VAULTS MULTIPLE CONDUCTOR HANGER 03/17/1997  
NCI-140 ARMORED CABLE SUPPORT FOR HIGH RISE BUILDINGS 12/31/2000  
NCI-160 UNDERGROUND SECONDARY CABLE - TRAINING & RACKING 02/08/1999  
NCI-180 CABLE END SEALING 04/20/2007  
NCI-210 Cable Accessories for 1000 KCMIL, EPR, 15 kV Flat Strap Triplexed Network Cable 623670 12/26/2013  
NCI-62 Pulling Iron Installation for In-Building Vaults, Network System 10/22/2021  
NCI-80 CABLE, EQUIPMENT AND FACILITY IDENTIFICATION 09/14/2007  
NCI-91 SEALING CONDUITS 09/17/2013  
NCI-99 LIGHT DUTY INSULATED SUPPORT ASSEMBLY NETWORK FACILITIES 10/02/2001  
NDK-140 SQUARE TILE DUCT REBUILD 04/21/1999  
NDK-150 Insulation Detail for City Light Duct Banks That Cross Steam Lines 02/10/2014  
NSP-100 Three-Conductor, 13.8 kV, Straight Splice, Polyethylene Insulation 06/13/2001  
NSP-110 TRIFURCATION of THREE CONDUCTOR POLYETHYLENE CABLE, 13 & 28 KV WITH and WITHOUT NEUTRAL/GROUND WIRES 12/18/2008  
NSP-115 THREE CONDUCTOR, 13.8KV PRIMARY SPLICE BELTS COMPACT SECTOR CABLES ONLY 07/10/2001  
NSP-120 13.8 KV PRIMARY WYE SPLICE POLYETHYLENE INSULATION 09/29/1999  
NSP-130 26-KV PRIMARY WYE SPLICE - POLYETHYLENE INSULATION 07/10/2001  
NSP-140 13.8 KV END BELL, PAPER INSULATED, LEAD COVERED 05/23/2001  
NSP-171 FLAT STRAP SHIELDING TERMINATION FOR USE IN DELTA NETWORK ONLY 05/01/2002  
NSP-20 SPLICE - STRAIGHT TWO CONDUCTOR CONCENTRIC, 5000 VOLT POLYETHYLENE INSULATED COPPER CABLE 08/10/2001  
NSP-200 SPLICE, WYE, THREE CONDUCTOR, 26 kV PAPER INSULATED, LEAD SHEATH 08/24/2001  
NSP-210 SPLICE- STRAIGHT, THREE CONDUCTOR, 26 kV PAPER INSULATED, LEAD SHEATH 06/19/2001  
NSP-220 TERMINATION POTHEAD, 25 KV SINGLE CONDUCTOR, PILC-PEJ 10/27/2004  
NSP-250 TERMINATOR - 13 KV FOR INVERTED INSTALLATION 06/10/2001  
NSP-270 TERMINATION OF 3/C XLP INSULATED, JACKETED CABLE USING PATR TERMINATORS, 15 kV OR 26 kV ROUND CONDUCTORS 07/20/2005  
NSP-280 TERMINATION OF 3/C 15 KV XLP INSULATED, PVC JACKETED CABLE USING 600 A DEAD BREAK ELBOWS ON AIR INSULATED METALCLAD SWITCHGEAR 02/17/1999  
NSP-30 SPLICE - STRAIGHT - 5000 VOLT, TWO CONDUCTOR CONCENTRIC, POLYETHYLENE INSULATED TO SINGLE CONDUCTOR 08/10/2001  
NSP-320 DEADBREAK STRAIGHT LINE CONNECTOR 600 AMP, 13 KV and 26 KV 07/07/2014  
NSP-321 25kV 600 AMP, Straight Receptacle Installation lnstructions 05/15/2003  
NSP-350 GROUND CONNECTION FOR SPLICES IN NETWORK VAULTS AND MANHOLES 02/24/1999  
NSP-60 TERMINATION, 2/C, 5 KV, CONCENTRIC POLYETHYLENE INSULATION 08/10/2001  
NSP-80 SPLICE, WYE, THREE CONDUCTOR, 13 KV PAPER INSULATED, LEAD SHEATH 10/27/2004  
NSP-90 SPLICE- STRAIGHT, THREE CONDUCTOR, 13 kV PAPER INSULATED, LEAD SHEATH 06/19/2001  
NTP-120 HAZELTINE MODEL 2391 TRANSMITTER INSTALLATION TYPE O1 07/28/2005  
NTP-121 HAZELTINE MODEL 2800 TRANSMITTER INSTALLATION TYPE O2 07/28/2005  
NTP-122 HAZELTINE MODEL 2778 TRANSMITTER INSTALLATION TYPE O3 08/29/2007  
NTP-123 DIGITALGRID NCS TRANSMITTER INSTALLATION, NETWORK PROTECTORS 10/03/2007  
NTP-130 BUS TIE SWITCH INSTALLATION 09/10/2008  
NTP-41 SEISMIC ANCHORING FOR OIL FILLED SPECIALTY TRANSFORMERS 01/25/2000  
NTP-60 Lighting and Sump Pump Installation for Single Transformer Vaults 11/13/2013  
NTP-70 HIGH VOLTAGE SWITCHROOM & MULTI-TRANSFORMER NETWORK VAULT LIGHT and RECEPTACLE CIRCUITS 09/28/2000  
NTP-80 Network Protector Fusing, Lead Sizes and Relays 07/28/2017  
NTP-90 Cable Limiters - Network 11/03/2014  
NVH-80 Network Area Requirements for Panel or Cast-in-Place Vaults 11/10/2020  
S128-1 WELDING AND CUTTING PRACTICES 05/01/2002  
S319-0/NSA-10 HAND SIGNALS FOR USE IN LINE CONSTRUCTION 04/28/2002  
S319-1/NSA-20 HAND SIGNALS FOR SHOVEL AND CRANE OPERATION 05/01/2002  
S319-2/NSA-30 SAFE WORKING LOAD FOR ROPES AND SLINGS 05/01/2002  
S403-1 SAFE POLE CLIMBING PRACTICES 05/01/2002  
U1-4.12/NCI-61 Pulling Cable Around Blocks 07/08/1996  
U1-4.15/NCI-20 Guide for High DC Voltage Field Testing of Insulated Power Cable 10/05/2011  
U1-4.51/NTP-100 Transformer Secondary Lead Sizes for Underground Installations 08/01/2007  
U10-1.2 Transformer Pad, Commercial and Industrial Underground from Overhead 12/30/2015  
U10-1.4 PADMOUNT TRANSFORMER INSTALLATION, GROUNDING AND CONNECTIONS 240/120 V, 1Ø, 3W, 25 THROUGH 167 kVA 12/03/2010  
U10-5.2 Pad Construction for Pad-Mounted Switchgear 11/13/2020  
U10-5.3/NTP-40 NETWORK TRANSFORMER ANCHOR BEAM FOR SEISMIC LOADING (EARTHQUAKE ANCHORS) 11/08/2013  
U10-5.5/NTP-50 VIBRATION DAMPERS NETWORK TYPE AND SINGLE PHASE TRANSFORMERS 03/21/2000  
U11-8 Commercial Subway Transformer 750 through 2500 kVA, Standard Installation 08/15/2017  
U11-9 NTP-110 TRANSFORMER AND NETWORK PROTECTOR SECONDARY BOLTING AND TAPING 10/26/2016  
U13-1/NGE-50 ELECTRICAL INSULATING OIL SAMPLING AND TESTING FLAT GAP 04/01/2005  
U2-11.2/NDK-20 REINFORCEMENT OF CONCRETE ENCASED DUCT RUNS 01/12/2011  
U2-11.40-NDK-40 Mandreling and Cleaning of Ducts and Conduits 11/10/2020  
U2-12.1/NVH-60 SUMP PUMP PIPE INSTALLATION, VAULTS and MANHOLES NEW 2" or REPAIR 1-1/4" 06/04/2001  
U2-14.2 Vault Installation 11/10/2020  
U2-15.1 Installation of Ring Type Vaults 11/10/2020  
U2-16 VAULT, MANHOLE, HANDHOLE NUMBER IDENTIFICATION 09/04/2001  
U2-22 Precast Panel Vault Installation, General, Non-Network Area 11/10/2020  
U2-6/NVH-20 INSPECTION AND REPAIR PROCEDURES FOR PRECAST VAULTS AND MANHOLES 02/01/2008  
U4-2.8/NCI-150 BENDING, TRAINING, AND RACKING UNDERGROUND SECONDARY CABLE (SERVICES AND/OR BUS TIES) 02/12/1999  
U4-3 NCI-170 BENDING, TRAINING, RACKING AND RE-REELING OF UNDERGROUND PRIMARY CABLE 03/07/2017  
U4-3.3 CABLE TAGGING AND PHASE MARKINGS 09/14/2007  
U4-3.5/NCI-130 CREEPAGE OF CABLE 07/06/1999  
U4-3.6/NCI-70 DUCT EDGE PROTECTION 03/22/2002  
U4-3.7/NCI-90 FIRE AND ELECTRIC ARC PROOFING OF CABLES 03/02/2006  
U4-5/NCB-50 INSTALLATION OF SECONDARY BUS BAR 12/06/2013  
U5-1.03/NCB-100 Application Data For Heat-Shrinkable Splice Covers And Cable Caps 11/03/2014  
U5-1.10/NCB-110 SUBMERSIBLE MULTIPLE CONNECTOR INSTALLATION FOR ALUMINUM OR COPPER SECONDARY CABLE-TYPE USE 11/18/2013  
U5-14/NSP-310 600 AMPERE PRIMARY EQUIPMENT TERMINATION 10/17/2014  
U5-15.05 SEPARABLE CONNECTOR (ELBOW), 200 A, LOADBREAK 01/25/2008  
U5-16.05 SEPARABLE CONNECTOR (ELBOW), 200 A, DEADBREAK 01/25/2008  
U5-17.05/NSP-304 Separable Connector (T-Body), 125 kV BIL, Deadbreak 12/23/2014  
U5-17.10/NSP-305 SEPARABLE CONNECTOR (T-BODY), 150 kV BIL, DEADBREAK 01/25/2008  
U5-2.7 J BOX MOUNTING AND GROUNDING 07/10/2001  
U5-2.8.4/NSP-300 600 AMP PRIMARY CONNECTORS AND CABLE MOUNTING METHODS 10/14/2016  
U5-2.8.5 TERMINATOR ELBOW RECEPTACLE INSTALLATION #8 KERITE CABLE 02/12/1999  
U5-2.8.7 200 AMPERE ELBOW SEALING ON 1/0, 28 KV JACKETED CONCENTRIC NEUTRAL CABLE 10/06/2006  
U5-2.9 2000 AMP, 600 VOLT ONE WAY AND TWO WAY SUBMERSIBLE CONNECTORS FOR ALUM. TO ALUM. AND ALUM. TO COPPER SECONDARY CABLES 09/04/2001  
U5-26.20/NSP-285 TERMINATION, 200 kV BIL, COLD SHRINK 12/11/2008  
U5-3.20.1/NSP-170 SPLICE, STRAIGHT, 28 KV, XLP OR EPR INSULATED CABLE 06/19/2001  
U5-3.20.3 GROUNDING SPLICES ON 28 kV DRAIN WIRE-SHIELDED CABLE 12/22/2005  
U5-3.20.4 GROUNDING 3M COLD SHRINK SPLICES ON 28 kV FLAT STRAP CABLE 05/23/2005  
U5-3.22.1 JACKET SEALING WHEN SPLICING JACKETED 1/0 28 kV C.N. CABLE TO BARE 1/0 28 kV C.N. CABLE 05/15/2008  
U5-7 INTERCEPTING EXISTING UNDERGROUND SERVICE 11/02/2001  
U7-2/NDK-130 RIGID ALUMINUM CONDUIT 01/16/2002  
U9-5 577 VAULT TRANSFORMER AND JUNCTION BOX INSTALLATION, GROUNDING AND CONNECTIONS 07/20/2010  
U9-5.5 Three-Phase Loadbreak Vault, 612 and Larger 03/01/2015  
U9-6 577 VAULT WITH THREE LOADBREAK JUNCT ION BOX ES, INSTALLATION, GROUNDING AND CONNECTIONS 10/30/2015  
U9-7.3 Grounding and Connection Diagram, Single Phase 26 kV Distribution Transformer 04/30/2014  
U9-7.5 Transformer Installation, Grounding and Connections 120/240 V and 240/480 V, 3-Phase, 4-Wire 04/30/2014  
U9-7.7 Transformer Installation, Grounding and Connections 208Y/120, 240Y/138, and 480Y/277 V, 3-Phase, 4-Wire Subtractive Polarity 08/15/2017  
259 results